Laserfiche WebLink
RUSS CHAPIN 249-464-6947 18-14-94 11:21 P.02 <br /> October 14, 1994 <br /> California State Water Resources Control Board <br /> Division of Clean Water program Fund 1'ro$ram <br /> Region 5 Underground Storage Cleanup <br /> post office Box 9444212 <br /> Sacramento, California 91244-2120 <br /> Attention: Mr. George Loekwood <br /> subject_ Chapin Brothers,lac. <br /> 1766 Monte Diablo Ave. <br /> Stockton, California 95203 <br /> Claim#l; 0()0557 <br /> 1)ear Mr. Lockwood: <br /> The purp nsc of this letter is to update you on the work perforated to date at the project <br /> site and to obtain approval from your office to Perform additional tests to develop an <br /> appropriate course of action for remediation. <br /> On July 22, 19941,Science &Engineering Analycas(SEACOR)submitted a Problem <br /> Assessment Report(PAIL)fol the site located at 1766 Monte Diablo Aveanue. <br /> San Joaquin County public Health Services,Environmental health Division lated (pHhe S EI Diewof <br /> the lead agerncy providing the oversight of the investigation has comp <br /> al vapor <br /> the PAR and concurs with {��PHSJF'recommendation be e thereultss obtainnn ned fronn finrthcr <br /> extraction and air spargang Study(RFS)and wall <br /> tests can be evaluated and utilized iu a formal Remedial Feasibility for the site in <br /> lnrovide adequate information to prepare a final remediation plan (FRP) <br /> question. <br /> 11,view of this fact,I have obtained a bid from the engineering firm of Wallace-Kuhl & <br /> Associates, Inc. to perform the work recommended by PJASXHD. Our current <br /> engineering firm Sl:ACOR,has acknowledged that this work is out of the scope of their <br /> firm which we believe will be able to <br /> capabilities, and thus have selected an eugnteer", <br /> perform the necessary tasks through the remediation phase of the that uest project. <br /> our office give approval to the additional work-oN011 is outlined <br /> '17�ercforc,I re q y <br /> in the propose] submitted by Wa&�Kuhl&Associates, and waive the bid proccsws in <br /> order to expedite this phase of the project. This re(luest come',;from the fact reh�.s v bids fro n credible that in the <br /> enginecring <br /> past we have had Feat�culty obtaining comp <br /> firms which has resulted in substantial delays. <br /> 1 <br />