My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 210, 1994 <br /> WALLACE • KUHL Mr. Harlin Knoll <br /> &ASSOCIATES INC. <br /> San Joaquin Country PHS/EHD <br /> "r'-) <br /> 1 P.O. Box 388 �? <br /> r•./ Stockton, California 9-5201-0388 JUN 2 1 1994 <br /> QUARTERLY STATUS REPORT ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> 1766 MONTE DIABLO A'YTNUE <br /> Stockton, California <br /> VVKA No. 2738.01 <br /> Dear Mr. Knoll, <br /> At your request, I am writing to inform you of the status of our work at the subject <br /> site. We have recently been retained by the owner to provide quarterly sampling of <br /> the four ground water monitoring wells associated with the site. We sampled the <br /> wells on Tuesday, June 14, 1994, and anticipate receiving analytical results at the end <br /> of the month. We will provide you a detailed report o.' our procedures and findings <br /> in early July. I have asked Mr. Balasek to call you when he returns from the field <br /> next week to discuss our sampling methods with you. Also, we are attempting to <br /> obtain results of the well casing elevation survey so that we may provide ground water <br /> flow direction and gradient information in our report. <br /> Please call me if you have any questions. <br /> . Geotechnical Engineerin- <br /> Engineering Geology <br /> Wallace ■ Kuhl & Associates, Inc. <br /> ` Environmental Consulting <br /> Remediation Service <br /> Eric Hubbard, R.G., C.E-G. <br /> (,on truction Inspection <br /> Senior Geologist <br /> Material, I eating <br /> EH:sdm <br /> Copy to: Mr. Russeil Chapin <br /> 3050 Industrial Blvd. x\2738-U! <br /> West Sacramento <br /> CA 95691 <br /> Fax 916.372.2565 <br /> 916.372.1434 <br />
The URL can be used to link to this page
Your browser does not support the video tag.