My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> Advanced -t;�,�oaiMEtic�� �1EAl-ltl <br /> GeoEnvironM& <br /> hminu. <br /> 10 March 2003 <br /> AGE-NC Project No. 95-0103 <br /> /Mr. Harlin Knoll <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Subject: Summary of March Meeting <br /> CHAPIN BROTHERS, INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr. Knoll: <br /> A meeting was held at the EHD office to discuss the continual need for ground water remediation <br /> at the above referenced site. The following parties participated in the meeting: <br /> • Mr. Harlin Knoll, San Joaquin Environmental Health Department <br /> • Mr. Nuel Henderson, San Joaquin Environmental Health Department <br /> • Mrs. Margaret Lagorio, San Joaquin Environmental Health Department <br /> • Mr. Russell ; hapin, , responsible party/property owner <br /> • Mr. Bill Little, Advanced GeoEnvironmental, Inc. (AGE) consultant for responsible <br /> party/property owner <br /> The following items were discussed during the 05 March 2003 meeting: <br /> 1. The ground water pump-and-treat system was in continuous operation at the site, operating <br /> for approximately three full quarters.Over this time period approximately 1.6 million gallons <br /> of impacted ground water has been treated. Cumulative totals of 4.3 lbs of Benzene and <br /> 95.9 lbs of TPH-g are estimated to have been extracted since ground water treatment began <br /> on 02 April 2002. <br /> 2. Contaminant concentrations have been reduced to approximately 1.3%benzene and 7.5% <br /> TPH-gasoline of the pre-remedation levels,at most impacted ground water monitoring wells. <br /> The remedation-goals were discussed, as present in the AGE letter dated 10 August 2001. <br /> 3. AGE recommended: continued quarterly ground water monitoring at the site as required by <br /> California Code of Regulations; and operation and maintenance of the ground water <br /> extraction and treatment system during the first quarter of 2003. <br /> 837 Shaw Road,Stockton,California 95215 <br /> Telephone(209)467-1006 FAX(209)467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.