My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:28:03 PM
Creation date
4/15/2020 2:17:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The ground water remediation system was inoperable between May 2005 and late September 2007, <br /> in order to observe the ground water chemical and geochemical parameters, for monitored natural <br /> attenuation.The ground water extraction system ceased operation on 10 May 2005,as approved in <br /> the Ground Water Monitoring-Natural Attenuation Work Plan, dated 21 March 2005. <br /> • 09 September 2007 and 31 December 2007, approximately 385,295 gallons of impacted <br /> ground water was treated with a total of five wells,for a total of 4,322,891 gallons of water <br /> has been treated since ground water extraction began. <br /> • December 2007 and December 2008, the pump-and-treat system extracted and treated <br /> approximately 1,448,070 gallons of impacted ground water.A total of 5,282,962 gallons of <br /> water has been treated since ground water extraction began in April 2002.During ground <br /> water remediation between April 2002 and May 2005 an estimated 193 lbs of TPH-g were <br /> extracted from ground water.During ground water remediation between December 2007 and <br /> December 2008, an estimated 763.6 lbs of TPH-g were extracted from ground water. <br /> The total weight of TPH-g extracted from the site with ground water extraction was 957 lbs or <br /> 153.12 gallons of gasoline. <br /> The total weight of TPH-g extracted from the site with soil vapor extraction was 2,645 lbs of TPH-g <br /> or 407 gallons of gasoline. <br /> The current dissolved mass has been calculated at 0.75 gallons of total petroleum hydrocarbons as <br /> gasoline, based on the last sampling event from monitoring wells and remediation well samples. <br /> The current adsorbed mass has been calculated at 38.98 gallons of total petroleum hydrocarbons as <br /> gasoline,based on the last sampling event from extraction well samples and soil borings. <br /> Based on site specific information, a release of a minimum of 3,000 gallons of gasoline was <br /> documented through inventory reconciliation.This volume of gasoline is approximately 18,750 lbs <br /> of TPH-g. <br />
The URL can be used to link to this page
Your browser does not support the video tag.