My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:19:53 PM
Creation date
4/15/2020 3:15:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec. 15. 2006 5.28PM Advanced GeoEnvironmental No, 7092 P. 2/3 <br /> Advanced <br /> GeoEnvironmental, Inc. :��•• <br /> 15 December 2006 <br /> AGE-NC Project No. 95-0103 <br /> Mr.Nuel Henderson <br /> San Joaquin County-Environmental Health Department(EHD) <br /> 304 E.Webber Avenue,3`d Floor <br /> Stockton, CA 95201 <br /> Subject: Ground Water Extraction-Work Plan Addendum <br /> CHAPIN BROTHERS INVESTMENTS,INC. <br /> 1766 Monte Diablo Avenue, Stockton, California <br /> Dear Mr. Henderson: <br /> At the request of Mr. Russell Chapin(property owner),Advanced GeoEnvironmental,Inc. (AGE) <br /> has provided the following Ground Water Extraction- Work Plan Addendum for the site at 1766 <br /> Monte Diablo, Stockton, California. The work plan addendum was prepared in response to the <br /> Environmental Health Department(EHD)letter dated 19 October 2006. <br /> AGE prepared the Remedial Action Work Plan Addendum, dated 28 June 2001 and the plan was <br /> approved by the EHD by letter dated 15 August 2001. The Remedial Action Work Plan Addendum <br /> described the use of monitoring well MW-1,vapor weld VE-1, VE-5 and VE-6,in conjunction with <br /> the use of proposed extraction wells EW-1, EW-2 and EW-3. Two of the existing shallow <br /> monitoring wells(MW-1) or vapor extraction wells(VE-1)did not produce adequate groundwater <br /> for active ground water remediation. However, vapor extraction well VE-6 did produce minimal <br /> groundwater and was significantly impacted with petroleum hydrocarbons, thus requiring <br /> remediation. <br /> Based on the current distribution of dissolved hydrocarbons (fourth quarter 2006) and the steady <br /> increase of dissolved hydrocarbon in the northern potion of the site, ground water extraction is <br /> required to capture the remaining dissolved plume. An ditional set of four-inch diameter wells <br /> should be installed at the following locations;vapor well VE-1 near the northern edge of the building <br /> on the site;north of well MW-4 near well MW-1 in the former eastern UST excavation and near the <br /> location of vapor well VE-6, at the northern edge of the western UST excavation. The objective of <br /> this work plan is to enhance the limited ground water extraction network currently on the site and <br /> produce an adequate draw-down for the dissolved plume capture. <br /> fir.. ✓" - ,2S <br /> Mw v - /tw/'- 3S ' TD (Idw �, �tUl SoetA 0-30' 6o <br /> V - _711T , <br />
The URL can be used to link to this page
Your browser does not support the video tag.