My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:19:53 PM
Creation date
4/15/2020 3:15:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07 April 1997 <br /> AGE-NC-95-0103 <br /> Page 2 of 5 <br /> six IAS injection points around the existing IAS well. Proposed well locations are illustrated on <br /> Figure 2. <br /> The monitoring well and SVE well will be installed using a truck-mounted drill rig and hollow stem <br /> augers. Soil samples will be collected at five-foot intervals and preserved for possible analysis. The <br /> IAS points will be installed using a van-mounted Geoprobe probing unit. Soil samples will not be <br /> collected during probing. <br /> 2.2. EQUIPMENT DECONTAMINATION <br /> All augers and soil probe rods will be steam-cleaned or thoroughly washed with a solution of <br /> Alconox, and triple rinsed with clean water prior to advancement. Furthermore, all sampling tools <br /> will be washed with a solution of Alconox, and triple rinsed with clean water prior to sample <br /> collection. <br /> 2.3. LABORATORY ANALYSIS <br /> Selected soil samples will be analyzed for total petroleum hydrocarbon quantified as gasoline(TPF-1- <br /> g), volatile aromatics (benzene, toluene, ethylbenzene and xylenes: BTE&X) and methyl-tertiary <br /> butyl ether(MTBE) in accordance with EPA methods 8015m and 8020/602. Laboratory reports of <br /> both soil and ground water analysis, testing methods, laboratory quality assurance/quality control <br /> (QA/QC) reports and sample chain-of-custody documentation will be presented in a report with the <br /> findings and recommendations. <br /> 3.0. PROCEDURES <br /> 3.1. DRILLING AND SAMPLING <br /> The following procedures will be performed for the installation of six sparging points and additional <br /> wells: <br /> 1. Notify the PHS-EHD at least 48 hours prior to the commencement of any work. <br /> 2. Advance two soil borings using a truck-mounted drill rig equipped with eight-inch, hollow- <br /> stem augers. The boring for the installation of the ground water monitoring well shall be <br /> advanced to a depth of approximately 30 feet. The boring for the installation of the soil vapor <br /> extraction well shall be advanced to a depth of approximately 15 feet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.