Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME K pE,4LTY PROJECT NUMBER 62591 oda 1 WELL NO N1111I� _ <br /> PROJECT MANAGER TYPE OF WELL if Monitoring Extraction Other <br /> RECORDED BY A F SAMPLED BY AF DATE 051 <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well 9esing Diameter <br /> 2-inch flinch Other Bailer - Type r,- <br /> q Pump - Type 1`T0,01JOA <br /> Well Total Oepth ��r70 feet below Top of Casing,TO <br /> Other - Specify <br /> Depth to Water feet below Top of Casing,WL Hydrocarbon Odors <br /> Water Column Length feet Yes IZ No <br /> � <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> 5'(04 x 6, 1 x _. - _ /o V 2— Calculated Purge Volume allons <br /> (WCL) (Multipll ) (No Volumes) Actual Purge Volume = _ L• gallons <br /> Multiplier (CasiEq,Diameter cher = Gallonsihnearfoot 2=01T 4=0-66 6=15 8=Z6 <br /> Groundwater Parameter Measurement Meter Type -1—o oCalibrated Yes No <br /> TIME ELAPSED FLOWRATE OTW pH EC TLF <br /> TURBIDITY REDOX COMMENTS <br /> TIME (GPM) (ft) hanhosJam (NTLI) mV <br /> A, <br /> 0 92GIMF 270 I-E A W,0 <br /> o9,29 3 ^0-<- 6, .77 117ef 5F.5 <br /> 0932 CD•/6 6.7 /yIa 1q.7 "��� o <br /> los <br /> n93 12 / 3 <br /> s <br /> e <br /> ENVIRONMENTAL,GEOTECHNICAL AND MATERIALS PROFESSIONALS <br />