Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request: 090396 Requested Completion Date- 091296 <br /> Proj Name: K.O.K. Reafty Pro} No: 94-334 Phase:001 <br /> Site Addres:2403 West Navy Dr. Stockton Ca. Activity: 10 <br /> Project Manager: Jeanne Homsey Field Tech- Alex Flores <br /> Client Contact: Phone No: <br /> Regulatory Contact: Mary Meas Phone No- 209-468-0337 <br /> Approval: Completion Date: <br /> OA <br /> Notify client and regulator 48 hrs. prior to site work. 4X— <br /> Monitor DTW/DTB 7 wells. In order, MW-7,5,6.3,4,1&2 <br /> Pure and sample MW-7,6,4.1 & 2 3 rd. M <br /> Sample for BTEX/TPHg with MTBE-and TPHd <br /> Samples to Argon Mobile Labs I-C C o L <br /> Wells are 29' deep. Water is at 13". Wells are 2". <br /> MW2 has had free product in the past Use interface 1robe and take bailer cut <br /> Take a long bailer to purge this well if it doesn't have product <br /> Contain puree water. Reuse drums from MW-7.6,5 NID last round of sampling. <br /> Pump drumed purge water into 500g tank and take a composite sample for <br /> BTEXITPHg and Total Pb <br /> If there is prgduct in MW-2. Bail and store on site in double container. <br /> Note amount of product stored on site. <br /> Fre are purchaEe order request <br /> AFLORESkF-WORK doc <br />