Laserfiche WebLink
1 • <br /> Fourth Quarter 1992 Activity Report <br /> . KOK Realty, 2403 W Navy Dr , Stockton, CA <br /> February 10, 1993 <br /> Page 4 <br /> flaws were evident from the video log The general construction of the well, as verified by <br /> video log, is shown in Attachment 3 <br /> On December 22, 1992, Delta Pump excavated the facility well's overlying concrete pad and <br /> associated fill to verify the condition of the annular seal No seal was observed (at the surface) <br /> and the casing was generally in poor condition <br /> A permit/workplan for well abandonment has been approved by PHS/EHD The well was <br /> destroyed in accordance with State and County guidelines on February 2, 1993 A summary of <br /> we destruction activities will be included in the next quarterly monitoring report <br /> ANTICIPATED ACTIVITIES <br /> The next groundwater monitoring event at the site will be conducted in February, 1993 Field <br /> activities will include measuring fluid level elevations in site monitoring wells, sampling and <br /> analysis, and free product removal Fluid levels will be measured with an oil/water interphase <br /> probe capable of measuring to an accuracy of 0 01 feet Free product will be contained on-site <br /> pending arrangement for proper disposal <br /> If you have any questions or require additional information, please contact John Lane at (209) <br /> 838-3507 <br /> Respectfully, <br /> RESNA Industries, Inc <br /> 3Irl &__� . <br /> John P Lane <br /> Project Geologist <br /> Gregory P Stahl <br /> CA Registered Geologist No 5023 <br /> TJL/ggk <br /> Attachments <br /> 4QMR1992 FNL <br />