Laserfiche WebLink
rr <br /> GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME PROJECT NUMBER 6z.53L • OCC t WELL NO 1�11N` <br /> PROJECT MANAGER �,1..�. �T TYPE OF WELL V Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY A DATE iA/0 9 ,y <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> We(4Casing Diameter <br /> V 2-inch flinch Other <br /> Bader - Type / <br /> Well Total Depth 1 D feet below Tap of Casing,TD Pump - 3ype701eI� - <br /> Other - Specify <br /> Depth to Water Z feet below Tap of Casing,WL Hydrocarbon Od_ogi' <br /> Water Column Length_feet Yes -V No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> ti I a , <br /> t <br /> X � X = 9. 1 Q Calculated Purge Volume = � � allons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = allons <br /> iVd�ttiplter Casa Oiame#etr cher GalkinsflirieaF foo# z=g 7 <br /> 4-046 6-15 8=7-13 <br /> I <br /> Groundwater Parameter Measurement. Meter Type Calibrated _Yes No <br /> r,ME ELAPSE] Ft.CWFtATE DTW pH EC T TURBIDITY REDOX COMMENTS <br /> TIME (Gp" (R) anhordcm d�C (NTU) mV <br /> CAL- (c0 11Tw — • v <br /> —I �•r7v a I 21 1 NUQ <br /> 0457 0 , 22 62,2 11 140 21.2 <br /> T <br /> _ ASV O CIA E INC. <br /> EWR0NA4WrAL GECTECNNIG4L ANO MATERALS PR0FESS7aNALS <br />