Laserfiche WebLink
n <br /> • <br /> g <br /> Wa terWork <br /> Health and Safety Alan <br /> - Underground Tank Investigation <br /> INTRODUCTION <br /> PURPOSE AND SCOPE <br /> The Health and Safety Plan, for underground tank Investigations, <br /> provides for the protection of on-site personnel and the <br /> surrounding community during site characterization activities . <br /> The requirements, specifications and procedures presented with <br /> this plan will apply to all personnel on-site, including <br /> employees, sub-contractors, site visitors and regulatory agency <br /> personnel. <br /> KEY PERSONNEL <br /> WaterWork 's Safety Coordinator/Protect Manager will Drovide <br /> training to site personnel in the use of safety and personal <br /> Protection equipment and will manage the on-site monitoring <br /> y program. The Safety Coordinator/Project Manager will have the <br /> authority to deny access to any individual without the proper <br /> training or protec-ive equipment required for the site conditions <br /> or those individuals disregarding .site safety procedures. All <br /> site personnel will be under the direction of the Safety <br /> Coordinator/Protect Manager. <br /> HAZARD ANALYSIS <br /> The property previously operated a gasoline and/or diesel fuel <br /> distribution facility. Historic data and evaluation oc <br /> subsurface indicate the presence or potential presence of <br /> hydrocarbon fuel conta;nination. <br /> The activities addressed by this safety plan include_surface_ -_and -- <br /> -- - subsurface --soil___-and groundwater sample collectton. These - - - - <br /> — activities present the potential for exposure to tnxic materials <br /> through both skin contact and Inhalation. The subsurface <br /> sampling may also pose a fire and explosion hazard from gases and <br /> vapors trapped beneath the ground surface. <br />