My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012605
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2500
>
3500 - Local Oversight Program
>
PR0545604
>
ARCHIVED REPORTS_XR0012605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:30:47 PM
Creation date
4/17/2020 3:23:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012605
RECORD_ID
PR0545604
PE
3528
FACILITY_ID
FA0004000
FACILITY_NAME
MUNICIPAL UTILITIES
STREET_NUMBER
2500
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16333003
CURRENT_STATUS
02
SITE_LOCATION
2500 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WaterWork <br /> Groundwater Monitoring protocol <br /> Monitoring depth to water and free product thickness within wells <br /> at the site will be conducted using an Interface Probe and <br /> Surface Sampler. The .interface Probe is a hand held, battery <br /> operated device for measuring depth to petroleum product and <br /> i depth to water as measured from an established datum (i.e., top <br /> of the well casing which has been survayed). For consistency, <br /> all measurements will be taken from the north side of the <br /> wellhead at the survey mark. To assess potential infiltration of <br /> fine grained sediments, total well depth will also be sounded. <br /> Product thickness is calculated by subtracting the depth to <br /> product from the depth to water. In addition, water elevations <br /> are adjusted for the presence of fuel <br /> calculation: with the following <br /> (Product Thickness) (,8)+(Water Elevation) <br /> a Corrected Water Elevation <br /> Note: The factor of 0.8 accounts for the density difference <br /> between water and petroleum hydrocarbons. <br /> Newly installed wells will be allowed to stabilize for 24 <br /> hours after development prior to free product inspection. <br /> - An acrylic Surface Sampler will be used for visual inspection of <br /> the groundwater in order to note sheens (difficult to detect with <br /> the Interface Probe), odors, microbial action and sediments. The <br /> sampler is calibrated in inches and centimeters for visual <br /> inspection of product thickness. <br /> To reduce the potential for cross conta►nination between wells, <br /> the monitorings will take place in order from the least to most <br /> .� contaminated. Wells containing free product will be monitored <br /> last. Between each monitoring the equipment will be washed with <br /> laboratory grade detergent and double rinsed with tap water, and <br /> final rinsed with deionized water. <br /> Water level data collected from the wells will be used to develop <br /> a groundwater equipotential contour map for the project site. <br /> Groundwater flow will be estimated to be perpendicular to <br /> equipotential-contour-lines-drawn-on-the-map: -- - <br /> io <br />
The URL can be used to link to this page
Your browser does not support the video tag.