My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012605
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2500
>
3500 - Local Oversight Program
>
PR0545604
>
ARCHIVED REPORTS_XR0012605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:30:47 PM
Creation date
4/17/2020 3:23:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012605
RECORD_ID
PR0545604
PE
3528
FACILITY_ID
FA0004000
FACILITY_NAME
MUNICIPAL UTILITIES
STREET_NUMBER
2500
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16333003
CURRENT_STATUS
02
SITE_LOCATION
2500 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s. k <br /> E- <br /> r .. <br /> { <br /> t <br /> E <br /> WaterWork <br /> Groundwater Sampling Protocol <br /> fi — <br /> �* Prier to arriving at the sampling site, all sampling equipment <br /> will be washed with laboratory grade detergent, and rinsed twice <br /> with tap water, once with acetone, and once with deionized water. <br /> The sample washing procedure will be carried out on-site before <br /> ' sampling of other monitoring wells, in such cases where more than <br /> one monitoring well is to be sampled. <br /> € Immediately prior to sampling, the depth to water IOTW) level in <br /> is the well will be recorded. The thickness of product on top of <br /> the groundwater, if present, will be measured using an interface <br /> probe. The procedure for conducting these monitorings are <br /> presented in the Groundwater Monitoring Protocol attachment. <br /> ks If free product is detected, analysis of groundwater for <br /> dissolved product will. be conducted after the free product has <br /> been removed from the well. If all Eras <br /> prouct removed, an interval specific sampling device willa be utilnzed to <br /> utilized <br /> collect a sample from below the zone of free product. Before <br /> collecting at least two groundwater samples from each well, the <br /> well will be purged until indicator parameters (temperature, <br /> conductivity and pH) stabilize. This will entail the removal of <br /> ' at least four or more well casing volumes by bailing or pumping. <br /> The criteria for determining well casing volumes and storage of <br /> purged waste is discussed in the WaterWork Well Development <br /> ( Protocol Attachment. The indicator parameter measurements will <br /> 11 be taken both before and after purging of each well casing <br /> volume. Once the well is purged and well water has stabilized, a <br /> sample will be collected after the water level approaches 80 <br /> percent of its initial elevation. Where water level recovery is <br /> slow, the sample will be collected after stabilization is <br /> achieved and enough water is present to fill sample containers. <br /> Cross contamination from transferrin <br /> from <br /> well to well will be avoided by utilizing dedicated i equipment. <br /> Where this is not feasible thorough cleaning of equipment will be <br /> to performed between sampling rounds. Sampling will proceed from <br /> the least contaminated to the most contaminated well, if <br /> information is available before sample collection, or if it is <br /> pa indicated by field evidence. <br /> Groundwater samples will be collected with a Teflon bailer with <br /> bottom emptying devices. Duplicate samples will be transferred <br /> to vials or containers that meet Regional Hoard specifications <br /> (Table 1). Groundwater from_the•..-bailer-will--be--transferred--to - --- <br /> the sampl-d_conbainer by allowing the fluid to flow slowly along <br /> the sides of the vessel. All containers will be filled above the <br /> e::�a� tap of the opening to form a positive meniscus. No head space <br />
The URL can be used to link to this page
Your browser does not support the video tag.