Laserfiche WebLink
DRAFT Ver. 1-C-doc-4-5-10 <br />Page 19 Tier II Qualified Facility SPCC Plan <br />The owner or operator must meet the general rule requirements as well as the requirements under this section. <br />Table G-20 General Rule Requirements for Onshore Oil Drilling and Workover Facilities <br />Mobile drilling or worker equipment is positioned or located to prevent discharge as described in §112.1(b). <br />[§112.10(b)] <br />Catchment basins or diversion structures are provided to intercept and contain discharges of fuel, crude oil, or <br />oily drilling fluids.[§112.10(c)] <br />A blowout prevention (BOP) assembly and well control system was installed before drilling below any casing <br />string or during workover operations.[§112.10(d)] <br />The BOP assembly and well control system is capable of controlling any well-head pressure that may be <br />encountered while the BOP assembly and well control system are on the well.[§112.10(d)] <br />Facility Name: <br />C. Onshore Oil Drilling and Workover Facilities (§112.10(b),(c)and (d)): <br />CALIFORNIA FREIGHT ACAMPO