My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCUST
>
805
>
2800 - Aboveground Petroleum Storage Program
>
PR0516480
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2020 2:20:07 PM
Creation date
4/21/2020 1:56:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0516480
PE
2832
FACILITY_ID
FA0010466
FACILITY_NAME
CALIFORNIA FREIGHT
STREET_NUMBER
805
Direction
S
STREET_NAME
LOCUST
STREET_TYPE
AVE
City
RIPON
Zip
95366
APN
25935010
CURRENT_STATUS
01
SITE_LOCATION
805 S LOCUST AVE
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT Ver. 1-C-doc-4-5-10 <br />Page 19 Tier II Qualified Facility SPCC Plan <br />The owner or operator must meet the general rule requirements as well as the requirements under this section. <br />Table G-20 General Rule Requirements for Onshore Oil Drilling and Workover Facilities <br />Mobile drilling or worker equipment is positioned or located to prevent discharge as described in §112.1(b). <br />[§112.10(b)] <br />Catchment basins or diversion structures are provided to intercept and contain discharges of fuel, crude oil, or <br />oily drilling fluids.[§112.10(c)] <br />A blowout prevention (BOP) assembly and well control system was installed before drilling below any casing <br />string or during workover operations.[§112.10(d)] <br />The BOP assembly and well control system is capable of controlling any well-head pressure that may be <br />encountered while the BOP assembly and well control system are on the well.[§112.10(d)] <br />Facility Name: <br />C. Onshore Oil Drilling and Workover Facilities (§112.10(b),(c)and (d)): <br />CALIFORNIA FREIGHT ACAMPO
The URL can be used to link to this page
Your browser does not support the video tag.