Laserfiche WebLink
V DRAFT Ver. 1-C-doc-4-5-10Page 23 Tier II Qualified Facility SPCC PlanATTACHMENT 3 – Inspections, Dike Drainage and Personnel Training LogsTable G-24 Inspection & Testing Log and ScheduleThis log is intended to document compliance with §§112.7(e), 112.8(c)(6), 112.8(c)(8), 112.8(c)(9), 112.8(d)(1), 112.8(d)(4), 112.9(b)(2), 112.9(c)(3),112.9(d)(1), 112.9(d)(4), 112.12.(c)(6), and 112.12(d)(4), as applicable.Date ofInspectionContainer /Piping /EquipmentDescribe Scope(or cite IndustryStandard)Observations Name/ Signature of InspectorRecordsmaintainedseparatelyaaIndicate in the table above if records of facility inspections are maintained separately at this facility.Facility Name:ATTACHMENT 3.1–Inspection Logand Schedule10,000-galabovegrounddiesel tankVisual inspections (STISP001, Standard forthe Inspection ofAboveground StorageTanks)Abovegroundpipes andvalvesVisual InspectionsAbovegroundcontainmentenclosureVisual InspectionsCALIFORNIA FREIGHT ACAMPO