Laserfiche WebLink
DRAFT Ver. 1-C-doc-4-5-10 <br />Page 3 Tier IIQualified Facility SPCC Plan <br />III. Plan Requirements <br />1. Facility Diagram (§112.7(a)(3)): <br />Table G-2 Facility Diagram <br />Describe in your Plan the physical layout of the facility and include a facility diagram, which must mark the <br />location and contents of each fixed oil storage container and the storage area where mobile or portable <br />containers are located <br />a. The facility diagram must identify the location of and mark as “exempt” <br />underground tanks that are otherwise exempted from the requirements of this part under §112.1(d)(4), <br />and produced water containers and any associated piping and appurtenances downstream from the <br />container, that are otherwise exempted from the requirements of this part under §112.1(d)(12). The facility <br />diagram must also include all transfer stations (such as tank loading and unloading areas) and connecting <br />pipes, including intra-facility gathering lines that are otherwise exempted from the requirements of this part <br />under §112.1(d)(11).[§112.7(a)(3)] <br />ABCDEFGHI JKLMNOPQRSTUVWXY <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />a The location and contents may be marked by identifying each tank/container and portable container storage area on the <br />diagram above with an ID code and including the ID code on Table G-3 on the following page. <br />✔ <br />SEE ATTACHED SITE MAP