Laserfiche WebLink
RECEN[a) <br /> OCT - 1 2010 <br /> ,. .� ENVIRONMENT HEALTH <br /> PERMIT/SERVICES <br /> FPG Rainone Construction Inc. <br /> 9-10-2010 <br /> Plan Check#: SR0060867 1St Review <br /> Agency. San Joaquin County <br /> Project: 2900 East Harding Way <br /> Remodel for Commissary <br /> Dear Rodney Estrada <br /> Please find the plan check response to your comments dated August 30, <br /> 2010. Please contact me id there are any questions about the plans or the <br /> response. <br /> Septic System Calculation Page: <br /> 1. See revised calculations tank size. <br /> 2. See revised calculation leach field. <br /> TI-2 Page: <br /> 1. Four existing 100' leach lines with D-boxes and seepage pits shown. One new <br /> 100' leach line with D-box and 36" seepage pit shown. <br /> 2. See the engineers design for the pumping system. When interceptor #1 <br /> reaches 2500 gallons water level this will spill over into the double pump system <br /> and will pump the water over to interceptor #2. Then from interceptor#2 drain by <br /> gravity to the existing 3000-gallon septic tank, and be dispersed to the leach <br /> field. If the interceptor#2 reaches 2500 gallon water level monitored by a high <br /> level sensor this sensor connected to a audio and visual alarm on the building <br /> main building across from interceptor#2 on the existing building wall. The <br /> audible sound will be 200 decibels and will shut down the pumping system at <br /> 746 Heartland Dr <br /> Manteca, Ca 95337 <br /> 209 471 1132 Lic#691437 <br />