Laserfiche WebLink
Y � <br /> San Joaquin Valley <br /> Unified Air Pollution Control District <br /> AUTHORITY TO CONSTRUCT <br /> PERMIT NO: N-665-1-1 ISSUANCE DATE: 04/29/93 <br /> LEGAL OWNER OR OPERATOR: QUIK STOP MARKETS, INC. <br /> MAILING ADDRESS: P.O. BOX 5745 <br /> FREMONT,, CA 94537 <br /> LOCATION: 3555 W HAMMER LANE, STOCKTON <br /> EQUIPMENT DESCRIPTION: <br /> REPLACE EXISTING NOZZLES WITH 24 NOZZLES SERVED BY EMCO WHEATON (G-70-52-AM) PHASE II VAPOR <br /> RECOVERY SYSTEM <br /> CONDITIONS <br /> 1 - All nozzles shall be equipped with coaxial hose configurations. <br /> 2 - At least 95% by weight of all gasoline vapors displaced during the filling of storage tanks and the <br /> refueling of vehicles shall be prevented from entering the atmosphere. <br /> 3 - The permittee shall perform a Dynamic Back Pressure Test using BAAQMD Method ST-27 within 60 days <br /> after initial start-up and as required by the Air Pollution Control Officer thereafter. <br /> 4 - The permittee shall perform a Leak Test using BAAQMD Method ST-30 within 60 days after initial <br /> start-up and as required by the Air Pollution Control Officer thereafter. <br /> 5 - The District shall be notified by the permittee 10 days prior to each test. The test results shall <br /> be submitted to the District no later than 30 days after each test. <br /> 6 - The vapor recovery system and its components shall be operated and maintained in accordance with the <br /> State certification requirements. <br /> 7 - All testing requirements contained in this permit shall be performed at least once every five years. <br /> This is NOT a PERMIT TO OPERATE. Approval or denial of a PERMIT TO OPERATE will be made after an inspection <br /> to verify that the equipment has been constructed in accordance with the approved plans, specifications and conditions of this <br /> Authority to Construct, and to determine if the equipment can be operated in compliance with all Rules and Regulations of <br /> the San Joaquin Valley Unified Air Pollution Control District. PLEASE NOTIFY THE DISTRICT COMPLIANCE DIVISION <br /> AT(209)545-7000 WHEN CONSTRUCTION OF THE EQUIPMENT IS COMPLETED. Unless construction has commenced <br /> pursuant to Rule 2050, this Authority to Construct shall expire and application shall be cancelled two years from the date of <br /> issuance. The applicant is responsible for complying for all laws, ordinances and regulations of any other governmental agencies <br /> which may pertain to the above equipment. <br /> DAVID L. CROW, EXECUTIVE DIRECTOR/APCO <br /> IL <br /> SEYED SDIN, DIRECTOR OF PERMIT SERVICES <br /> NorthernrRegional Office *4230 Kiernan Ave. Suite 130 *Modesto California 95356 * 209 545-7000 *FAX 209 545-8652 <br />