My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_1990-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:22:05 AM
Creation date
4/27/2020 12:23:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2001
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_1990-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Quik Stop Market No. 132 August 14, 1990 <br />Job No. 349132-31 Page 4 <br />REPORT <br />Exceltech will prepare a site investigation report presenting the findings of the <br />investigation. The report will include: <br />• Field procedures for exploratory borings. <br />• Results of analytical testing. <br />• A site map showing features relevant to the investigation. <br />• Boring logs for each exploratory boring drilled by Exceltech. <br />• Construction details of the groundwater monitoring well. <br />• Concentration contour maps of soil contamination, if applicable. <br />• Interpretation of data. <br />• Recommendations. <br />Exceltech is prepared to perform the proposed scope of work once approval is received <br />from the San Joaquin County Health District. We have scheduled the drilling for <br />August 16, 1990. The drilling and well development is expected to take 1 to 2 days. <br />The sampling of the well will take place approximately 3 days following development. <br />Laboratory results will be available approximately 2 days following submittal. A final <br />written report will be prepared approximately 1 to 2 weeks following receipt of the <br />laboratory results. <br />
The URL can be used to link to this page
Your browser does not support the video tag.