My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_1990-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:22:05 AM
Creation date
4/27/2020 12:23:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2001
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_1990-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE NAME <br />CONTRACTOR: NAME <br />OWNER: NAME <br />UNDERGROUND TANK INSPECTION RECORD <br />NEW TANK INSTALLATION <br />CITY <br />INSPECTOR'S NAME <br />21P <br />PHONE <br />PHONE <br />tMell <br />9f <br />DIS <br />INSPECTOR'S <br />INITIAL INSPECTION <br />DATE <br />kPPROVED <br />PPROVED <br />INITIALS <br />t i <br />. UL numbers �C� i ('? tank size /0,000 0 <br />8 <br />f� <br />3. <br />Overfill protection installed, describe: <br />ITEM OR EQUIPMENT INSPECTED <br />4. Performance test of product line leak detector. (Hard wired) <br />/ <br />i� <br />✓ <br />1. Fees paid <br />f ee� <br />V <br />ll <br />Plans Approved <br />tMell <br />9f <br />(1p erstePIPING <br />�i <br />STAGE INSPECTION <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />INITIAL INSPECTION <br />V,- <br />t' <br />�'. <br />2. <br />Ball float valves installed. <br />t i <br />. UL numbers �C� i ('? tank size /0,000 0 <br />8 <br />f� <br />3. <br />Overfill protection installed, describe: <br />. Tank tested upon delivery [Holiday (plasteel) or air at 5 PSI (FRP)) <br />4. Performance test of product line leak detector. (Hard wired) <br />/ <br />i� <br />✓ <br />. Visual inspection of secondary containment. <br />Unused tank opening seated and catholically protected. <br />-4 (0 <br />6. Permit to operate application complete. <br />. Tank appropriately placed with approved backfill. <br />tMell <br />9f <br />(1p erstePIPING <br />�i <br />STAGE INSPECTION <br />1. Pressure test of piping. (Primary and Secondary (NFPA 30)) <br />Op1q, <br />V,- <br />t' <br />�'. <br />2. <br />Ball float valves installed. <br />f� <br />3. <br />Overfill protection installed, describe: <br />4. Performance test of product line leak detector. (Hard wired) <br />�1 <br />✓ <br />4. <br />Unused tank opening seated and catholically protected. <br />-4 (0 <br />6. Permit to operate application complete. <br />5. <br />Visual inspection of secondary containment on piping. <br />!Lek( <br />e0 <br />6. <br />Monitoring ports in place and brought to grade. (lockable weather proof covers) <br />*j <br />7. <br />Fill and vent piping brought to grade. <br />11/ <br />8. <br />Product line leak detector in place. (Hard wired) <br />*01( <br />9. <br />Approved tank leak monitoring device installed. <br />10. <br />All galvanized piping and fittings properly wrapped. <br />2�1 <br />11. <br />Pressure decay test on complete tank and product delivery system. <br />07-gq( <br />/;E <br />FINAL INSPECTION <br />1. Precision test successfully completed and hard copies received. (NFPA 329) <br />Op1q, <br />V,- <br />2. Spill protection at fill pipe. <br />f. <br />3. Performance test of overfill protection system. <br />4. Performance test of product line leak detector. (Hard wired) <br />5. Performance test of continuous monitoring system(s) on tank (s) <br />Zq! <br />6. Permit to operate application complete. <br />7. Acceptable recordkeeping system. <br />Comments: _ <br />5 23 006 10/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.