My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_1990-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:22:05 AM
Creation date
4/27/2020 12:23:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2001
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_1990-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATPiN <br />GUIDE SPECIFICATIONS --DOUBLE WALL FIBERGLASS REINFORCED PLASTIC (FRP) UNDERGROUND <br />STORAGE TANKS <br />SNORT FORM: <br />The contractor shall provide Double Wall Fiberglass Reinforced Plastic <br />(FRP) U.L. labeled underground storage tanks as shown on the drawings. <br />Sizes and fittings shall be as shown. The tanks shall be Century -Cast" <br />Tanks as manufactured by XERXES CORPORATION. <br />Tanks shall be tested and installed with pea gravel or crushed stone as <br />specified in the current installation instructions provided with the tank. <br />LONG FORM: Section 15177.1 <br />Part I General <br />1.01 Related Work Specified in Other Sections <br />A. Liquid Level Gauges: Section 15174 <br />B. Plastic Pipe: Section 15064 <br />C. Anchor Bolts: Section 05501 <br />D. Cast -in -Place Concrete: Section 03300 <br />1.02 Quality Assurance <br />A. Acceptable Manufacturer: XERXES CORPORATION <br />B. Governing Standards; primary tank <br />1. ASTM standard document number D4021-81. <br />2. Underwriters Laboratories; Inc. (01.) File MH 9061 (N) for <br />storage of flammable liquids. A U.L. certification plate shall be <br />attached to each tank. <br />3. National Fire Protection Association (NFPA30) Flammable and <br />Combustible Liquids Code and (NFPA31) Standard for <br />Installation of Oil Burning Equipment. <br />4. National Sanitation Foundation, Standard 14. <br />5. Factory Mutual Systems approval J.I. 1 G4AO.AF. <br />6. Military Specifications No. MIL -T-52777 (A). <br />C. Governing Standards; secondary tank: <br />1. Underwriters Laboratories, Inc. (U.L.) File MH 9061 (N) for <br />storage of flammable liquids. A U.L. certification plate shall be <br />attached to each tank. <br />2. National Fire Protection Association (NFPA30) Flammable and <br />Combustible Liquids Code and (NFPA31) Standard for <br />Installation of Oil Burning Equipment. <br />1.03 Submittals <br />A. Shop Drawings: Contractors shall submit _ copies of shop <br />drawings for each tank. Drawings shall show locations of all fittings, <br />accessories, and critical dimensions. <br />B. Catalog Data: Contractor shall submit copies of manufac- <br />turer's literature to include copies of manufacturer's current <br />installation instruction. <br />Part 11 Products <br />2.01 Double Wall Fiberglass Reinforced Plastic (FRP) Underground <br />Storage Tanks with a Primary (internal) tank and a Secondary (exter- <br />nal) tank. <br />A. Loading Conditions -Tank shall meet the following design criteria: <br />1. Internal load: Primary and Secondary tanks shall withstand 5 psi <br />air pressure test with 5 to 1 safety factor. Contractor shall <br />individually test tanks prior to installation as this is to test for <br />leakage. Maximum test pressure Is 5 psi. <br />2. Vacuum Test: Every tank shall be mercury vacuum tested by the <br />tank manufacturer to assure structural integrity, Primary tank <br />shall be tested to 11,5 inches and secondary tank tested to 9.5 <br />inches mercury vacuum. <br />3. Surface Loads: Tank shall withstand surface H-20 axles loads <br />when properly installed according to current manufacturer's <br />installation instruction. <br />4. External hydrostatic pressure: Tank will withstand 4' of ovorbur- <br />den with the hole fully flooded with a 3:1 safety factor against <br />buckling. <br />5. Tanks shall support accessory equipment such as heating coils, <br />drop tubes, submersible pumps, ladders when installed a000rd- <br />ing to tank manufacturer's recommendatitons and limitations. <br />B. Product Storage: <br />1. Tanks shall be capable of storing petroleum with specific gravity <br />up to 1.1. <br />2. Both primary and secondary tanks shall be individually vented to <br />atmospheric pressure. The tanks are not designed as pressure <br />vessels. <br />3. Tanks shall be capable of storing gasoline or gasohol (10% <br />ethanol and 90% gasoline mixture), jet fuel, diesel fuel, AV gas, <br />potable water at ambient underground temperature or fuel oil at <br />temperatures not to exceed 150° F. <br />C. Each tank shall be equipped with two 22" I.D. manways. Each steel <br />manway cover shall have three 4" NPT fittings welded in place. <br />D. Materials: <br />1. Tanks (Primary and Secondary) shall be manufactured with 100% <br />isophthalic polyester resin and glass fiber reinforcement with no <br />sand fillers. <br />E. Annular Space <br />1. Tank shall have a space between the primary and secondary <br />shell walls to allow for the free flow and containment of all leaked <br />product from the primary tank. Space also allows the Insertion of <br />a monitoring device through a monitoring fitting. <br />F. Tank Dimensions (Refer to Xerxes literature on gallonage.) <br />1. Tanks shall have nominal capacity of gallons. <br />2. Tank shall have nominal outside diameter feet. <br />3. Tank shall have approximate overall length of feet. <br />2.02 Accessories <br />A. Anchor Straps -Provide FRP anchor straps as manufactured by tank <br />manufacturer. Number and location of straps shall be specified in <br />current installation instructions of tank manufacturer. <br />B. Manways <br />1. All manways to be flanged and 22" I.D. complete with U.L: listed <br />gaskets, bolts and covers. (30" I.D. manway is also available.) <br />2. Location as shown on drawings. <br />3. Manway extension tubes shall be FRP and 24" long for manways <br />shown on drawings. <br />4. Each steel manway cover shall have three -4" NPT fittings <br />welded in place. <br />C. Fill Tubes <br />1, Tubes shall be FRP and factory installed by manufacturer. <br />2. Location as shown on drawing. <br />3. Tubes shall be 4" diameter with 6" steel fitting and a 6" x 4" dou- <br />ble tapped reducer bushing. <br />D. Gauge Plate -Shall be installed at location shown on drawing. <br />E. Heating Coils <br />1. Heating Coils shall be installed in a separate 22" manway and <br />shall be standard items supplied by tank manufacturer. <br />2. Location as shown on drawings. <br />F. NPT Threaded Fittings <br />1. All threaded fittings shall be a material of construction consistent <br />with the requirements of U.L. label. <br />2. All standard thread fittings shall be half couplings and shall be 4" <br />in diameter. Reducers are to be used for smaller sizes where <br />shown and provided by contractor. <br />3. Sizes Standard Other Sizes <br />Fill 4" <br />Gauge 4" <br />Inlet 4" <br />Outlet 4" <br />Vent 4" <br />4. Suction Line -Shall be installed by contractor on site. Pipes shall <br />terminate a minimum of 4" from bottom of tank. <br />6. Return line shall be installed by contractor. <br />G. Monitor Fittings <br />1: Tank shall have two test monitor fittings consisting of a 2" NPT <br />fitting on the primary tank and a 6" NPT fitting directly above on <br />the secondary tank. <br />2. Tank shall have two monitor fittings, one near each end of the tank. <br />XERXES no <br />CORPORATION <br />7901 Xerxes Avenue S., Minneapolis, MN 55431 <br />(612) 887=1890 <br />o:w.1/85 Manufacturing facilities in Anaheim, CA 0 Bartow, FL 0 Seguin; TX 0 North Ridgeville, OH 9 Penns Grove, NJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.