Laserfiche WebLink
A. Yurnish alld install dispenser safeuy valves,. <br />B. install 4nmiti-producc dipsunsers and triol (furnished <br />by Quik Qop). <br />C. Coordinate start up. <br />D. TL':;t calibrate fur weights anW "wasurcs. <br />S. Cuncre Le - <br />A. <br />Conscrue L two canopy footings. <br />,I'. <br />Cons true L Lwo islands with metal formn. <br />C. <br />Construct reinforced drive slabs and ua"sVa5 wLL!t <br />black color concrete. <br />D. <br />Construct air and water pad. <br />E. <br />Furnish and install island bumper polew. <br />6. <br />Metal <br />A. <br />Furnith and install island sign frames. <br />A. <br />Paint Lfim fur this work. <br />8. <br />Electrical <br />A. <br />Yurnish and install yard conduits and wiring as follows: <br />1. (3) 1/2 conduits and wire to turbins. <br />2. (1) 1/2 conduit and cable for speakers. <br />3. (1) 3/4 conduit and wire for canopy lights. <br />4. (1) 3/4 conduit and pull wire for anular space leak <br />detector. <br />S. (1) 3/4 conduit and pull wire for future !eve! <br />indicator. <br />6. (10) 3/4 conduits and wire for dispensers. <br />B. <br />Extend electric wiring for above inside building and <br />connect to breaker provided by store contractor. <br />C. <br />Install and connect dispenser controls inside of building. <br />D. <br />install and connect canopy lights Wthcs furnished by <br />Quik SLOP). <br />9. <br />Miscellaneoi-is <br />A. <br />install air and water unit (furnianco Ly Quik Stop). <br />L-', . <br />Provide gauge stick. <br />C. <br />Clean up our work and leave in broom glean condition <br />cowpleiv and ready for operation. <br />