Laserfiche WebLink
! s <br />Pk 2 <br />Re: Underground Storage Tank Plan Requirements <br />Quik Stop Markets, Inc. <br />Hammer Lane and Mariner <br />Stockton, CA <br />C. Piping and Equipment: <br />2.—A Phase II Vapor Recovery System will be installed. <br />a) Type of recovery system: Phase II - Tokheim <br />b) Number of nozzles: 24 <br />Type: Emco Wheaton <br />Model numbers will be submitted upon installation <br />c) Type of Multiplane swivels: Emco Wheaton <br />d) Type of overhead retractors: Emco Wheaton <br />e) Diameter: see submitted plans <br />f) Slope of vapor line: see submitted plans <br />g) Length and diameter of vapor hose: <br />i) Distance from island to base of vapor hose swivel: <br />see submitted plans <br />This information is given in reference to the "Underground'Storage <br />Tank Plan Requirements" form dated 8/84 issued by the San Joaquin <br />Local Health District. <br />