My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2001-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:28:12 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2008
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_2001-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPESER CONTAINMENT C TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: O Pressure O Vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp#1/2 Disp#3/4 Disp#5/6 Disp#7/8 <br /> UDC manufacturer Bravo Bravo Bravo Bravo <br /> UDC material FRP FRP FRP FRP <br /> UDC depth (inches) 30 30 30 30 <br /> Height from UDC bottom to highest <br /> piping penetration 11 8 12 10 <br /> Height from UDC bottom to lowest <br /> electrical penetration 4 Bottom 4 4 <br /> Condition of UDC prior to testing Dry Dry Dry Dry <br /> Portion of UDC tested Entire Entire Entire Entire <br /> Type of shut-down present Sensor Sensor Sensor Sensor <br /> Was sensor removed for testing? Yes Yes Yes Yes <br /> Was sensor properly replaced after testing? Yes Yes Yes Yes <br /> Depth of water level from UDC bottom (in.) 15 15 15 15 <br /> Wait time for water level to stabilize (hr:min) 0:10 0:15 0:15 0:10 <br /> Test start time 11:39 AM 10:22 AM 11:39 AM 10:22 AM <br /> Initial Probe Reading 3.3657 6.1519 4.2829 5.7726 <br /> Test end time 11:55 AM 10:37 AM 11:55 AM 10:37 AM <br /> Final Probe Reading 3.3651 6.1518 4.2827 5.7727 <br /> Test duration (hr:min) 0:16 0:15 0:.16 0:15 <br /> Change in water level (t 0.0000 inches) -0.0006 -0.0001 -0.0002 0.0001 <br /> Pass/Fail threshold 40.0020 inches/;Hr.) 0.0020 0.0020 0.0020 0.0020 <br /> TEST RESULT PASS PASS PASS PASS <br /> Comments: <br /> © 2006 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.