Laserfiche WebLink
• <br />Monitoring System Certification <br />Site Address: <br />F. In --Tank Gauging / SIR Equipment: <br />• <br />d c-��` �,� . Date of Testing/Servicing: . / � �� <br />heck this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complet <br />❑ Yes <br />❑ Yes <br />❑ Yes <br />❑ Yes ' <br />❑ Yes <br />❑ Yes <br />e the following <br />❑ No* <br />cnectuisr: <br />Has all input wiring been inspected for prop er entry and termination, including testing for ground faults? <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ No* <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ No* <br />Was accuracy of system water level readings tested. <br />Were all probes reinstalled properly? <br />❑ No* <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H. below, describe how and when these deficiencies were or well be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Comnlete the folIowinz checklist: <br />Yes <br />❑ Yes <br />❑ No* <br />❑ N/A <br />❑ No* <br />For equipment start-up or annual equipment certification, was a teat; smmulaiea to \ GILD' LLLJ YLLLVLA&A-4 -M1-. <br />(Check all that apply) Simulated leak rate: 11-3-g.p.h.'; ❑ 0.1 g.p.h.Z; ❑ 0.2 g.p.h.'- <br />Notes: 1. Required for equipment start-up certification and annual certification: <br />2. Unless mandated by local agency, certification required only for electronic LLD start-up. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus properly calibrated?: <br />Yes <br />Yes <br />❑ No* <br />❑ No*. <br />❑ N/A. <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Yes <br />❑ No* <br />XfN/A <br />For electronic LLDs, does the turbine automatically shut off.if the LLD detects a leak? <br />' Yes <br />❑ No* <br />@(-N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />yes <br />For electronic LLDs, does the turbine • automatically shut off if any portion of the monitoring system <br />malfunctions or fails a test? <br />❑ No* <br />4fT NIA <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ Yes <br />❑ No* <br />43- N/A <br />Yes <br />❑ No* <br />Were all items on the .equipment manufacturer's maintenance checklist completed? <br />_ -_ .al hn r rrArfvdt_ - <br />* In the Section H, Detow, uescrlue uurr anu ...,cal .1ac�. u�==�-�•----- - __ _ _ _ - <br />H. Comments: <br />