My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2001-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:28:12 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2008
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_2001-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />'F. In -Tank Gauging / SIR Equipment: <br />C <br />eck this box if tank gauging is used only for inventory control. <br />O eck this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com tete the follo ing checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? _ <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />® Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes 1 ❑ No* I Were all items on the equipment manufacturers maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Cmmnlete the fnilawinu rherklist! <br />es <br />13No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />El <br />ElN/A <br />(Check all that apply) Simulated leak rater g.p.h.; l1g.p.h; p:2g.p.h. <br />s <br />1,2N o * <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />es <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />be -NIA <br />Cl Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />RsN/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />./A <br />or fails a test? <br />-s <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />V <br />CW -WA <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />M <br />Pa,,c 3 of 3 OAS I <br />
The URL can be used to link to this page
Your browser does not support the video tag.