My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2001-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:28:12 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2008
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_2001-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HPALTH <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DIVISION <br />Karen Furst, M.D., M.P.H., Health Officer <br />304 East Weber Avenue, Third Floor - Stockton, CA 95202 <br />209/468-3420 <br />3 1 ► 1 17►i @ on, 9 9:Ze]%\ 11 <br />Site information: Quik Stop # 132, 3555 W. Hammer Lane, Stockton, Ca. <br />Your application for permit to install under -dispenser containment and sensor has been <br />approved with the following conditions: <br />I . Contact fire department for permit. <br />2. A soil sample is to be collected and analyzed as indicated in the attached minimum <br />verification laboratory analysis. Analytical result shall be submitted to <br />Environmental Health Division (EHD). <br />3. Submit sampler and laboratory information to EHD for approval prior to commencing <br />work and/or scheduling any inspection appointment. <br />4. Contact EHD for the following inspections: <br />a. Soil sampling below each dispenser. <br />b. Pressure test on primary and secondary lines. <br />c. 24-hour lake test. <br />d. Final inspection. <br />5. All lines shall be precision -tested by a licensed tank tester. Result is to be submitted <br />to EHD prior to placing the tank system in service. <br />6. Submit As -Built plan to EHD prior to scheduling final inspection. <br />7. If automatic pump shutdown is provided it must satisfy all conditions listed in section <br />2636(g) of California Code of Regulation. <br />8. Any changes in information provided to EHD must be submitted to EHD for approval <br />prior to commencing work. <br />9. Permit expires on 9/20/01. <br />If you shall have any questions please contact me at 209-468-3444. <br />Michael th, Sr. REHS <br />San Joaquin County <br />Environmental Health Division <br />A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.