My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:37:32 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wait time for pressure to stabilize (hr:min) <br />Comments: <br />:10 <br />:10 <br />:10 <br />Test start time <br />9:10 AM <br />9:15 AM <br />SECONDARY <br />LINE TESTING APR 2 9 2015 <br />ENVIRUNMEN MAL <br />QC p' TU '"1COA O-ri ACAIT <br />Test Method By: O Manufacturer a Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: a Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range 0 to 15 psig) <br />Description <br />Line #1 <br />Line #2 <br />Line #3 <br />10:15 AM <br />Tank product <br />Pipe manufacturer <br />Gasoline - 87 <br />Ameron <br />Gasoline - 89 <br />Ameron <br />Gasoline - 91 <br />Ameron <br />5.0 <br />pipe isolation <br />Pipe material <br />FRP <br />FRP <br />_ <br />FRP <br />105 <br />95 <br />Primary pipe diameter (inches) <br />2 <br />2 <br />2 <br />0.5 <br />TEST RESULT <br />Secondary pipe diameter (inches) <br />3 <br />3 <br />3 <br />Method of secondary pipe isolation <br />Clamshell/ Boot <br />Clamshell/ Boot <br />Clamshell/ Boot <br />Location of secondary <br />Wait time for pressure to stabilize (hr:min) <br />Comments: <br />:10 <br />:10 <br />:10 <br />Test start time <br />9:10 AM <br />9:15 AM <br />9:20 AM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test end time <br />10:10 AM <br />10:15 AM <br />10:20 AM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />pipe isolation <br />Sump /UDC <br />Sump /UDC <br />Sump /UDC <br />Estimated length of piping run (feet) <br />105 <br />95 <br />105 <br />(include length of branch runs) <br />0.5 <br />0.5 <br />0.5 <br />Wait time for pressure to stabilize (hr:min) <br />Comments: <br />:10 <br />:10 <br />:10 <br />Test start time <br />9:10 AM <br />9:15 AM <br />9:20 AM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test end time <br />10:10 AM <br />10:15 AM <br />10:20 AM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />1:00 <br />Change. in pressure (psig) <br />0.0 <br />0.0 <br />0.0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />© 2015 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.