Laserfiche WebLink
HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br /> METHOD OF EMPLOYEE NOTIFICATION PA SYSTEM, VERBAL <br /> _._._. ------.. __...... .-.... __ _..............._....................-------------------- <br /> (e.g. <br /> ------(e.g. siren, public address system, <br /> verbal orders, etc.) <br /> EVACUATION ASSEMBLY AREANTS) (9) FROPARKING LOT <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE LUNCH ROOM/SHOP ! <br /> USE10 ___._._.._____._._.........___.__..__._._....._...__..__...._......___.___._...._...__.._.._..__.......__....,..._.............._.._.....__.__._._........_._.._.---_-._., <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11� <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facility <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> NORTH TRAILER MANUFACTURER EAST TRUCKING FIRM <br /> _. ...... _......_ ......._.. ............ ..... <br /> ..... ........................................__............_._........_.................................._.� <br /> SOUTH LARGE EQUIPMENT STORAGE AREA WEST TRAILER MANUFACTURER <br /> SPILL CONTROL PROCEDURES SECTION <br /> SPILL CONTROL LEADER (12) KEVIN SMITH <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> THE FOLLOWING INDIVIDUALSIPOSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL (13) <br /> KEVIN SMITH, MARK GEORGE, STEPHEN SEIBLY <br /> i <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s) indicated below to control <br /> spills of hazardous materials on its property. Persons performing these tasks will possess written <br /> procedures for performing them and will have received training on the procedures and equipment <br /> needed prior to carrying them out. Locations of needed equipment are shown on the facility map. At a <br /> minimum our business must isolate the area of the spill and make notifications. <br /> SPILLS OF LIQUID MATERIALS <br /> 0 Plug and Patch Container Build Retention Dike <br /> ® Remove Sources of Ignition ® Position Container so as to Stop Leak <br /> ® Reduce Pressure in Container/System ® Isolate Area and Make Notifications <br /> ® Neutralize Spilled Material ® Secure System Valves and Closures <br />