Laserfiche WebLink
2. On a monthly basis, the fire pumps are tested and all post indicator valves and <br />fire hydrants are inspected by the Safety Leader. <br />3. • a • •_ a • flow test is performed in all buildings by the <br />Safety Leader to verify water flow alarm activation. <br />4. On a monthly basis, all fire extinguishers in the complex are visually inspecW <br />by the Safety Leader, Safety Team and other designees. The inspection tags <br />are <br />• and dated at the time • inspection. <br />5. On an annual basis, the fire extinguishers are serviced by a fire extinguisher <br />service contractor. <br />Further information or explanation about the contents of the Emergency Action Plan <br />be directed to: 1 <br />E <br />W <br />Mr -IMP MET ME El <br />Plant Manager <br />Gloria Suarez <br />Safety Leader <br />(209) 810-2895 <br />Robert Vargas <br />1: Facility <br />1: <br />MaintenaqS"M r <br />(209) 810-2801 <br />i Duffy Ireier <br />Production Mgr <br />Linette Burila <br />E <br />W <br />