Laserfiche WebLink
61 1h <br /> WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST`location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641(h). <br /> THREE PACS GROCERY <br /> FACILITY NAME 6732 E.WATERLOO ROAD DATE <br /> FACILITY ADDRESS <br /> 1.Narne(s)and Titles)of the people responsible for performing the monitoring and/or maintenance <br /> E%-A'bo tC.Jt — P"ITN <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS <br /> Ct9nl'0 N 1V 4 ' PIPING C®'�r4^1 <br /> 3.Describe the location(s)of where the monitoring will be performed. ie: location of sensors <br /> ZW <br /> �a►t�uc tuut.�x SAhrFd �2.ptpe Sj1n1a c3�sov $1��sn�s6x ®�, SFwAet <br /> 4.Describe the following equipment for each underground storage tank. / <br /> Name and Model of Monitoring Panel <br /> Name and Model of Line Leak Detectors f <br /> Name and Model of Annular Sensors <br /> AeOMArl S <br /> Name and Model of Piping Sensors An <br /> Name and Model of Dispenser Sensors /N(-O/v <br /> Type of overfill prevention 070W <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yes V No 0 <br /> Does the turbine shut down if a sensor is disconnected? Yes Q` No 0 <br /> Does the turbine shut down is the monitoring panel loses power? Yes V No 0 <br /> 6.How will the alarm history and subsequent maintenance be recorded? 40 t"4 7/QAI <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recordhIg for the monitoring equipment.What month will <br /> annual monitoring certification be performed in? I1K®`✓C/"8 9:e <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before January 1,2003. <br /> 8.Describe the training necessary for the operation of UST system,including piping,and the monitoring <br /> equipment. fN s7M u-ML cX PLAI <br /> Tiler aP�A'rvai �Cc��l►ly ?o i-�m�u�'�crtv��� <br /> I:\mstemi-le\UST\monitoringplan.doc <br /> 7A 2002 <br />