Laserfiche WebLink
/-\mb Hpproveo ium—rleaiy r-nase a Cvm system— vrc-/-u-i-H kauu evozzie/ rage .1 a <br /> 1.9.2.6 Procee ith V/L test. If the,grade,point testkes not within the limit of the <br /> Executive Order, use the procedure outlined in Section 1.10, How to Adjust <br /> the V/L (Vapor over Liquid) Ratio on the Healy 900 Model Nozzle, to adjust the <br /> V/L. <br /> Note: If more than one nozzle share vacuum plumbing with the <br /> nozzle being tested, one troubleshooting method for a low V/L ratio is to <br /> seal all nozzles other than the nozzle being tested, using plastic bags <br /> and tape or rubber bands. If leaks in the nozzles/check valves served <br /> by a common vacuum pump cause the bags to deflate, the low V/L ratio <br /> may have been caused by a leak through an idle nozzle during the test. <br /> The V/L test to verify compliance, however, shall be conducted without <br /> "bagging" any of the nozzles. <br /> 1.9.2.7 Remove the seal pins and magnet assembly; loosen thumbscrew and remove <br /> V/L adapter from nozzle. <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax 603.882.5189 <br /> JWAWJ <br /> Healy Systems, Inc. —the innovative leader of Stage 11 vapor recovery equipment <br />