My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:24:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hrcts Hpprovea ouivo—ryeaiy r-nase n Cvm oysiem— vrc-zu-i-H tyuu ivozzie/ rage is <br /> 1.10 How to Adjust the AVapor over Liquid) Rattio on the aly 900 Series Nozzle <br /> 1.10.1 Remove, or pull forward, the Scuffguard from the nozzle body. <br /> 1.10.2 With Spout of the Nozzle facing to your left, locate the Vapor Flow Control <br /> Valve on the side of the Nozzle Body. Do not remove cover assembly. <br /> � vA�jp vvv�\ <br /> ie y. <br /> 1.10.3 Locate the opening in the center on the cover of the Vapor Flow Control <br /> Valve. Insert a .050 hex-key into the center opening of the Vapor Valve <br /> Cover Assembly. <br /> �F <br /> F � <br /> { <br /> 1.10.4 After making any adjustments as show below, the nozzle has to be retested as <br /> specified in Exhibit 5, Section 7., of the Healy Phase II EVR System Executive <br /> Order VR-201-A, for V/L (Vapor over Liquid) readings. <br /> 1.10.4.1 Adjust clockwise to increase V/L reading. <br /> 1.10.4.2 Adjust counter-clockwise to decrease V/L reading. <br /> 1.10.4.3 Repeat Section 1.10.4 until the nozzle V/L is between 0.95 and 1.15. <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax 603.882.5189 <br /> WOW <br /> Healy Systems, Inc. —the innovative leader of Stage 11 vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.