Laserfiche WebLink
SWRCB, January 2002Page — of <br />5. SECONDARY <br />L b A ! PIPE <br />Test Method Developed 'sPipingruftfurer '91ndustryStandard tProfessional Enginee <br />t}i- <br />Other <br />Tea Mediod Used: 0 vacuum 0 Hydrostatic <br />Other r <br />r # rtr r t treat ':,t er ri <br />piping# <br />4g # <br />piping <br />piping # <br />Piping Material: <br />Piping Mantifixancr <br />Piping Diameter. <br />Length of Piping Rum <br />Product Mored.: <br />NIethod and location of <br />_ <br />piping -run. isolation: <br />Wait bene between apphking <br />pressweNacumulwater and <br />starting test: 3 <br />Test Start Time: C,— <br />Initial Reading (R4): <br />Test End Time: 4 t ^a �a <br />Final Reading (RF): <br />Test : ' <br />Change in Reading (Rv-Rf): <br />Pass/Fait Threshold or <br />Criteria: <br />Test ult. Pass 17 Pad <br />® Pass y ail <br />Q Pass xFad <br />❑ Pass O Fain <br />