My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
50
>
2900 - Site Mitigation Program
>
PR0523379
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:12:26 PM
Creation date
4/27/2020 2:43:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523379
PE
2959
FACILITY_ID
FA0015797
FACILITY_NAME
UNION PACIFIC RAILROAD - BOW TIE
STREET_NUMBER
50
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515007
CURRENT_STATUS
01
SITE_LOCATION
50 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> remedial actions where warranted, and will help to expedite future productive use of the OUs <br /> where the RI results indicate no future action is needed. <br /> 1.4 Site Description and History <br /> The full Railyard site covers approximately 34 acres, bounded by Sixth Street to the north, <br /> MacArthur Drive to the east and Central Avenue to the west, as shown on Figure 2. Areas <br /> adjacent to the site are a mix of commercial and residential development. <br /> The site was previously used as a Southern Pacific Transportation Company (Southern Pacific) <br /> maintenance facility, which was decommissioned in the 1940s. It was later used as a rail <br /> welding facility. A historical valuation map showing many of the site features and OU boundaries <br /> is provided as Figure 3. All operations had ceased and a majority of the structures and railroad <br /> tracks were removed in the 1980s. The site is currently vacant. Southern Pacific was acquired <br /> by Union Pacific in 1996. <br /> In 1991, the development firm Braddock and Logan Associates was considering purchase of the <br /> Railyard and an adjacent agricultural parcel for residential development. To that end, they <br /> initiated a Level One Environmental Site Investigation (ENGEO, 1991). This study identified <br /> several areas of potential concern on the Railyard property, including former wastewater ponds, <br /> an aboveground storage tank, three metal standpipes and a concrete-lined sump filled with an <br /> oily substance, maintenance facilities and a large stockpile of soil and debris. To investigate <br /> whether environmental impacts had occurred in these areas, a Transfer Assessment Workplan <br /> was prepared (Anderson, 1991), but this investigation was not implemented as proposed. <br /> Southern Pacific did subsequently proceed with a related scope of investigation for OU-1, as <br /> described below. Background information for each of the OUs is summarized as follows. <br /> 1.4.1 Operable Unit 1 <br /> OU-1 consists of approximately 17 acres in the eastern portion of the Railyard, bounded on the <br /> north by the railroad right-of-way that fronts Sixth Street, on the east by MacArthur Drive, on the <br /> south by Gonzalez Street, and on the west by the extended alignment of East Street that serves <br /> as the boundary between OU-1 and OU-2 (Figure 2). <br /> Past OU-1 improvements included railroad tracks, wheel shops, locker rooms, planking, oiled <br /> macadam, rail beds, a coal house, refuse pit, and various air and water pipelines. A rail welding <br /> facility was operated in OU-1 until the 1980s. In the late 1980s to early 1990s, the southeast <br /> portion of the OU, along MacArthur Drive, was leased to American Transit Mix Company, <br /> Inc./RMC Lonestar. Their operations included two underground storage tanks (USTs) <br /> (500-gallon unleaded gasoline and 1,000-gallon diesel), which were removed in 1989 (Industrial <br /> Compliance [IC], 1992a). <br /> As part of the UST removal, 16 cubic yards (cy) of soil containing petroleum hydrocarbons were <br /> excavated and transported offsite for disposal. Three groundwater monitoring wells, designated <br /> MW-1(RMC), MW-2(RMC) and MW-3(RMC), were installed in this southeastern corner of OU-1 <br /> and sampled for three consecutive calendar quarters. No analytes were detected above <br /> laboratory reporting limits, and the wells were reportedly abandoned in late 1992 (Terranext <br /> Remedial Investigation Work Plan Page 2 <br /> Former Tracy Railyard, Tracy, California <br /> g:Vs-groupladminWb105%0565777.03_uprr%094eportslwork planVi finalltextdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.