My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
50
>
2900 - Site Mitigation Program
>
PR0523379
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:12:26 PM
Creation date
4/27/2020 2:43:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523379
PE
2959
FACILITY_ID
FA0015797
FACILITY_NAME
UNION PACIFIC RAILROAD - BOW TIE
STREET_NUMBER
50
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515007
CURRENT_STATUS
01
SITE_LOCATION
50 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> Section 3: Field Activities <br /> 3.1 Soil Sampling & Analysis <br /> Soil sampling and analysis procedures and methods are fully documented in the SAP prepared <br /> for the Railyard (Appendix A). The objectives of the SAP are to: <br /> • Provide an overview of the remedial investigation to be undertaken and the types of <br /> samples to be collected. <br /> • Provide clear and sufficient detail for implementing proven and reliable field sampling <br /> activities. <br /> • Describe the standard methods to be used for handling and testing of samples, from the <br /> point of collection to laboratory testing. The SAP includes analyte and media-specific <br /> laboratory test methods with the corresponding numerical reporting values useful for <br /> evaluating the goals of the remedial investigation. <br /> The SAP also includes specific field preparation steps will be completed, including utility <br /> clearance for all boring locations and fiber optic notification. <br /> 3.2 Laboratory Program <br /> Soil and groundwater samples will be submitted to Severn-Trent Laboratory, Pleasanton, <br /> California (STL) (State Certification No. 2496)for laboratory analysis by the methods indicated <br /> in Tables 1 and 2. A list of the analytical methods and detection limits are provided in the QAPP <br /> (Appendix B). <br /> Soil samples will be collected and contained for shipment to the laboratory as described in <br /> Section 5 of the SAP. Table 2 lists the size and type of laboratory-provided containers required <br /> for collection of groundwater samples, preservation required, and analysis holding time. <br /> 3.3 Health & Safety Plan <br /> In accordance with the Occupational Safety and Health Administration (OSHA) and California <br /> Occupation Safety and Health Act (Cal OSHA) standards (§CCR 5192), a site-specific HASP <br /> has been prepared for the proposed subsurface characterization activities prior to <br /> implementation_ It establishes general health and safety protocols to be used by Kennedy/Jenks <br /> personnel during boring and sampling activities to reduce the possibility of injury and exposure <br /> to potentially hazardous materials. The HASP is provided in Appendix C. <br /> Remedial Investigation Work Plan Page 11 <br /> Former Tracy Railyard, Tracy, California <br /> g:Gs-groupLadrynWb10510565777.03_upnl0g-repatslwork planVi finaA*xtda <br />
The URL can be used to link to this page
Your browser does not support the video tag.