My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
50
>
2900 - Site Mitigation Program
>
PR0523379
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:12:26 PM
Creation date
4/27/2020 2:43:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523379
PE
2959
FACILITY_ID
FA0015797
FACILITY_NAME
UNION PACIFIC RAILROAD - BOW TIE
STREET_NUMBER
50
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515007
CURRENT_STATUS
01
SITE_LOCATION
50 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
707"fARCADISnA <br /> APR _ 4 2008 ARCADIS GBM,Inc. <br /> 155 Montgomery Street <br /> ENVIRONMENT HEALTH Suite 1500 <br /> PERMIT/SERVICES San Francisco <br /> California 94104 <br /> MEMO Tel 415 374 2744 <br /> To: Copies: Fax 415 374 2745 <br /> Mike Infurna <br /> From: <br /> Hollis E. Phillips <br /> Date: ARCADIS Project No.: <br /> 3 April 2008 RC721.1.6 <br /> Subject: <br /> Additional Groundwater Investigation Work Plan <br /> UPRR Tracy—Tracy, California <br /> Mike: <br /> Enclosed please find the Work Plan for additional work to be conducted at the UPRR Tracy Site. This <br /> work is being conducted because of data gaps that were identified during the February 2008 CPT <br /> Investigation. This work is an extension of the work described in Kennedy/Jenks' October 30, 2006 Work <br /> Plan for Phase II Remedial Site Investigation, Former Tracy Railyard, Tracy, California. This Work Plan <br /> was submitted final to the Department of Toxic Substances Control, the lead regulatory agency at the Site. <br /> Melissa Straten of ARCADIS has discussed the work and permitting issues with you. We are tentatively <br /> scheduled to begin this work on Thursday April 10, 2008. Please contact me at 415.374.2744 X 13 to <br /> discuss if that is an achievable schedule. <br /> Hollis <br /> • Page: <br /> c1hepVmw with"o.doc 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.