My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
50
>
2900 - Site Mitigation Program
>
PR0523379
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:12:26 PM
Creation date
4/27/2020 2:43:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523379
PE
2959
FACILITY_ID
FA0015797
FACILITY_NAME
UNION PACIFIC RAILROAD - BOW TIE
STREET_NUMBER
50
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515007
CURRENT_STATUS
01
SITE_LOCATION
50 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> 622 Folsom Street <br /> San Francisco, CA 94107-1305 <br /> 415-243-2150 <br /> Transmittal 415-896-0999 (Fax) <br /> www.KennedyJenks.com <br /> TO: Mr. Mike Infurna FROM: Hibo Mohamed for Mike McLeod <br /> San Joaquin County Environmental Health DATE: 22 December 2005 <br /> Department K/J#: 0565777.18 <br /> 304 East Weber Ave. 3rd Floor SUBJECT: Drilling Permit Application — <br /> Stockton, Ca 95202-2708 UPRR Tracy <br /> VIA: ❑ Mail ® Overnight ❑ Courier ❑ Fax ## pgs. (inc. cover) <br /> PLEASE FIND ENCLOSED: <br /> Copies Date No. Description <br /> 1 each 1 One Drilling Permit Application with Signed LCD <br /> Figure showing boring locations <br /> Check No. 1160 for$79.00 <br /> THESE ARE SUBMITTED AS CHECKED BELOW: <br /> ❑ As requested <br /> ❑ For information and coordination <br /> ❑ Return material when review complete <br /> ❑ Return after loan to us <br /> ® For approval by: 1/4/06 Return to: Mike McLeod <br /> ❑ For review and comment by: Return to: <br /> ❑ Other: <br /> REMARKS: Mr. lnfurna, <br /> Enclosed please find the above-listed items. <br /> We began drilling and sampling work at the UPRR Tracy site in December 2005. We are resuming <br /> work in January to finish the original scope (begun in December 2005) and drill additional borings. <br /> The permits for the original scope were issued in December 2005. <br /> We plan to drill five additional soil borings in Parcel 23 to further assess soil quality along the <br /> western limits of the site. Because these borings are not part of the original permitted scope, we <br /> are submitting an additional permit application and fee. <br /> The drilling work is scheduled to begin on 4 January 2006. If there is anything at all you need to <br /> process the forms please let me know at 415-243-2508. <br /> Thank you very much. <br /> Signed: ti <br /> 1 <br /> Copies to: File Hibo Mohamed <br /> plis-proj\2005\0565777.03 uprr tracyMot_sjc tracy 3.doc IKJC©Rev.2004] <br />
The URL can be used to link to this page
Your browser does not support the video tag.