My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26500
>
3500 - Local Oversight Program
>
PR0545613
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:41:24 PM
Creation date
4/27/2020 3:32:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545613
PE
3528
FACILITY_ID
FA0005466
FACILITY_NAME
LOPEZ, PAM
STREET_NUMBER
26500
STREET_NAME
NOWELL
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26500 NOWELL RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
845 Horn Road, #190 1.W <br /> Sacramento, CA 95827 <br /> (916) 363-1871 <br /> (916) 363-1875 FAX <br /> & Assoc*1ates <br /> May 1, 1995 Proposal No. 07-40-0008 <br /> Ms. Pamela Lopez � 616c/o Mr. Robert Holiday O <br /> P.O. Box 393 <br /> Thornton, California 95686 Rpslyxj <br /> MAY 18 1995 <br /> SUBJECT: Proposal - Preparation of a <br /> - Project Workplan for a Preliminary ENVIRONMENTAL HEALTH <br /> Soil and Groundwater Investigation PERMITISERVICES <br /> 25500 Nowell Road <br /> Thornton, California <br /> Dear Mr. Holiday: <br /> BSK & Associates, Inc. (BSK) is pleased to present this proposal for the preparation of a <br /> Workplan for a Preliminary Soil and Groundwater Investigation at the Lopez property <br /> located at 26500 Nowell Road in Thornton, California. <br /> The purpose of our proposed scope of services would be to prepare a Workplan for the <br /> initial investigation to delineate the vertical and lateral extent of soil and groundwater <br /> impacted by the Ieaking underground fuel storage tank at the property. The Workplan <br /> would include a scope of work to be performed in conjunction with the investigation, and <br /> would be prepared in general conformance with the Tri-Regional Board Staff <br /> Recommendations for Preliminary Investigation and Evaluation of Underground Tank Sites. <br /> PROJECT SCHEDULE <br /> BSK would commence work on the Workplan within two days of execution of this <br /> contract. We anticipate that the Workplan would be submitted for review by the San <br /> Joaquin County Health Department within seven working days following authorization to <br /> proceed. <br /> FEES <br /> The services outlined above would be provided on a Time and Expenses basis for an <br /> estimated fee of $1,102. BSK would not exceed the estimated fee without prior <br /> authorization. A breakdown of anticipated project costs for our scope of services is <br /> attached. <br /> Geotechnical Engineering - Engineering Geology•Environmental Services•Construction Inspection &Testing•Analytical Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.