FU G RO WEST, INC. <br /> STANDARD OPERATING PROCEDURES <br /> I RE. SOIL BORING SAMPLING <br /> SOP-1 <br /> During drilling with a hollow-stem auger or air-rotary rig, soil samples are typically collected in <br /> thin-walled brass or stainless steel tubes b inches long by 2 inches outside diameter Three of <br />' the tubes are set typically in an 13-inch-long split-barrel sampler The sampler is usually <br /> lowered into the open borehole attached either to the end of drilling pipe or on a wire-line <br /> hammer device <br />' When possible the split-barrel sampler is driven its entire length either hydraulically or by <br /> repeatedly pounding a 140-pound hammer using a 30-inch drop The number of drops (blows) <br />' used to drive the sampler is recorded on the boring log The sampler is extracted from the <br /> borehole and the tubes containing the soil samples are removed Upon removal from the sampler <br /> the ends of the lowermost tube are typically covered with aluminum foil or "Teflon" sheets and <br />' plastic caps The sample may be extruded from the tube and sealed within another appropriate <br /> cleaned sample container (e g , glass jar) The sealed sample is labeled and refrigerated for <br /> delivery, under strict chain-of-custody, to the analytical laboratory These procedures minimize <br /> the potential for cross-contamination and volatilization of ,,olatile organic compounds (VOC) <br /> prior to chemical analvsis <br /> Material from one of the other tubes is analyzed in the field. when required, using either a <br /> portable photolonization detector (,PID) or equivalent analytical instrument The purpose of this <br /> field analysis is to qualitatively determine the presence or absence of hydrocarbons The soil <br /> sample is enclosed in a container (eg plastic bag) to allow for some volatilization of VOC The <br /> PID is then used to measure the concentrations of hydrocarbons within the container headspace <br />' The data is recorded on the boring logs at the depth corresponding to the sampling point <br /> Any remaining soil collected from the sampler at that interval is described geologically using the <br />' USCS or other appropriate classification system) on a boring log All drilling and sampling <br /> equipment are either steam-cleaned or washed prior to use at each site and between boreholes to <br /> minimize the potential for cross-contamination Sampling equipment is also cleaned between <br /> tsamples <br /> 1 <br /> 1 <br /> 1 <br /> I uQ,ro west In, <br /> 50p-! 1)"0", '994 <br />