Laserfiche WebLink
August 5, 1997 <br /> 38737 001 Harding Lawson ,Associates <br /> Ms Mary Meays <br /> San Joaquin County Public Health Services <br /> Page 7 <br /> SCHEDULE <br /> HLA understands that PHS/EHD concurs as to the need to sample the monitoring wells and arrangements <br /> are presently being made with TVG to perform this work Analytical data will be analyzed on an <br /> expedited 5-working day turn-around basis for the monitoring well samples A letter report summarizing <br /> the monitoring data will be submitted witlun one week of receipt of the analytical data After receipt of <br /> approval from the PHS/EHD on the work proposed in this report, and completion of contracts with TVG, <br /> HLA is prepared to schedule the field work within two weeks to acquire the data that was to be collected <br /> by the SECOR investigation. A brief letter report will be submitted to PHS/EHD and the RWQCB within <br /> three weeks of the receipt of the analytical data <br /> iYours very truly, <br /> _D Gia f <br /> HARDING LAWSON ASSOCIATES ��\� p } a <br /> Wa_P_dk Na 6046 <br />' Gary D Haeck, Ph D ,R G � ��p, e-14 <br /> 8 <br /> Project Ge logist �Q- <br /> 'OF 0�1�OQ� <br /> Mic a Leacox, , CEG <br /> Associate Geologi <br /> GDH/GLFItb/G 1WPIGDMGH38737R 288 <br /> cc Ms Elizabeth Thayer, RWQCB <br /> Mr Bob Cartwright, TVG <br /> Mr Dave Wissing,TVG <br /> Mr Juan Qui}ano,TVG <br /> Attachments Plate 1 Site Vicinity Map <br /> Plate 2 Site Location Map <br /> Plate 3 Site Plan <br /> Plate 4 Cross Section A-A' <br /> Plate 5 TPHg Groundwater Plume <br /> Table 1 Groundwater Analytical Results <br /> Appendix A Table from Previous Report <br />