r _ . <br /> PUM <br /> (RW4CB). It is anticipated that processing of the <br /> application will require 8 to 12 weeks, but can take up to <br /> six months, depending an RWQCB workload and timely review. <br /> Drawings of treatment equipment and locations will be <br /> prepared after the work plan has been dccnpted by the <br /> Environmental, Health and RWOCB. <br /> 3.7 Tmplemantation Schedule <br /> i <br /> The work proposed in this remedial action plan will be <br /> Implemented according to the schedule presented in Table 4. <br /> The schedule will commence upon approval from the regulatory <br /> agencies to proceed. The report of waste discharge <br /> application for waste discharge requirements will be <br /> submitted as soon as regulatory approval of this proposal is <br /> received. <br /> i <br /> i <br /> 4.0 REFERENCES <br /> r California Department of Water Resources, 1978, Evaluation j <br /> of Groundwater Resources; Sacramento Valley: California <br /> Department of Wafter Resources Bulletin 118-6, 136 p. <br /> Page, R. W., 1986, Geology of the Fresh Groundwater Basin of <br /> the Central Valley California with Restore Maps and <br /> Section: U.S. Geological Survey Professional paper, 1401- <br /> C, 54 p. r <br /> i <br /> Mr <br /> f.w <br /> 1 <br /> F.. <br /> w. <br /> M. <br /> F. <br /> Ie <br /> .r <br /> k <br /> 5 <br />