Laserfiche WebLink
TABLE OF CONTENTS <br /> CROSS REFERENCE MATRIX FOR NON-PRODUCTION FACILITIES.....................................iv <br /> 1.0 GENERAL REQUIREMENTS FOR SPILL PREVENTION,CONTROL,AND <br /> COUNTERMEASURES [40 CFR 112.71.......................................................................................1 <br /> 1.1 MANAGEMENT APPROVAL OF PLAN [40 CFR 112.7]............................................................ 1 <br /> 1.2 GENERAL APPLICABILITY [40 CFR 112.1(b);40 CFR 112.7(a)(1) and(2)]............................. 1 <br /> 1.2.1 Qualified Facilities [40 CFR 112.6].............................................................................................. 1 <br /> 1.2.2 Facility Description and Layout [40 CFR 112.7(a)(3)] ................................................................2 <br /> 1.2.3 Facility Containers [40 CFR 112.7(a)(3)(i)through(iii)].............................................................2 <br /> 1.2.4 Countermeasures and Disposal [40 CFR 112.7(a)(3)(iv) and(v)]................................................4 <br /> 1.2.5 Discharge Contact list [40 CFR 112.7(a)(3)(vi)] ..........................................................................5 <br /> 1.2.6 Spill Notification [40 CFR 112.7(a)(4)]........................................................................................5 <br /> 1.2.7 Spill Response [40 CFR 112.7(a)(5);40 CFR 112.4(a)]...............................................................7 <br /> 1.3 DISCHARGE FLOW PREDICTION [40 CFR 112.7(b)]................................................................8 <br /> 1.4 CONTAINMENT [40 CFR 112.7(c)]...............................................................................................9 <br /> 1.5 PRACTICABILITY OF SECONDARY CONTAINMENT(40 CFR 112.7(d))............................. 10 <br /> 1.6 INSPECTION RECORDS [40 CFR 112.7(e)]................................................................................ 10 <br /> 1.7 TRAINING [40 CFR 112.7 (f)] ...................................................................................................... 11 <br /> 1.8 SECURITY [40 CFR 112.7(g)] ...................................................................................................... 12 <br /> 1.9 TANK TRUCK LOADING/UNLOADING [40 CFR 112.7(h)].................................................... 12 <br /> 1.10 CONTAINER FAILURE EVALUATION [40 CFR 112.7(i)]....................................................... 12 <br /> 1.11 CONFORMANCE WITH REQUIREMENTS [40 CFR 112.7 0)]................................................ 12 <br /> 1.12 QUALIFIED OIL-FILLED OPERATIONAL EQUIPMENT [40 CFR 112.7(k)]......................... 13 <br /> 2.0 REQUIREMENTS FOR ONSHORE FACILITIES [40 CFR 112.81........................................13 <br /> 2.1 GENERAL SPCC PLAN REQUIREMENTS [40 CFR 112.8(a)].................................................. 13 <br /> 2.2 FACILITY DRAINAGE [40 CFR 112.8(b)(1)through(5)] .......................................................... 13 <br /> 2.3 BULK OIL STORAGE CONTAINERS [40 CFR 112.8(c)(1)through(11)] ................................ 14 <br /> 2.4 FACILITY TRANSFER OPERATIONS,PUMPING,AND FACILITY PROCESS [40 CFR <br /> 112.8(d)(1)through(5)]................................................................................................................. 15 <br /> 3.0 SUBSTANTIAL HARM CRITERIA [40 CFR 112 APPENDIX C]..........................................15 <br /> 4.0 FACILITY RESPONSE PLAN [40 CFR 112.201........................................................................16 <br /> 5.0 LIMITATIONS...............................................................................................................................16 <br /> viii <br /> A <br /> ~' CONDOR <br />