My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
816
>
3500 - Local Oversight Program
>
PR0545615
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 4:39:48 PM
Creation date
4/27/2020 4:33:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545615
PE
3528
FACILITY_ID
FA0003911
FACILITY_NAME
VAN DE POL ENTERPRISES INC
STREET_NUMBER
816
Direction
E
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102010
CURRENT_STATUS
02
SITE_LOCATION
816 E FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alp <br /> CHRONOLOGY <br /> PACIFIC PRIDE RIPON CARD LOCK <br /> 816 S. HWY 99 FRONTAGE ROAD, RIPON <br /> 9117/02 Underground storage tank piping removed and soil samples collected <br /> beneath the piping. Analytical results were 18,000 mg/kg of TPH-diesel <br /> and 1600 mg/kg of TPH-gasoline in sample PP-1, 5100 mg/kg of TPH- <br /> diesel and 41 mg/kg TPH-gasoline in PP-2. Samples PP-3 through PP-7 <br /> had concentrations of TPH-diesel beneath 3 mg/kg and no detection of <br /> TPH-gasoline. All other constituents tested for were non detect except <br /> PP-1 had .14 mg/kg of ethyl benzene. The samples were collected at 3 to <br /> 4 feet below surface grade (bsg). <br /> 10/11/02 Site placed in Local Oversight Program. i <br /> i <br /> 12/10/02 Work pian submitted to Environmental Health. <br /> 12/11/02 Electronic unauthorized release form completed in Geotracker. <br /> 12/13/02 Work plan approved. <br /> 3/11-12/03 Geoprobes B1 through B5 completed with soil and water samples <br /> collected for analysis. <br /> 618103 Date of Preliminary Site Assessment Report of March 2003 work. Ten soil <br /> and five groundwater samples were analyzed and there was no detection <br /> of contaminants. Groundwater was at about 28 feet bsg. Soil samples <br /> analyzed were from 10 to 30 feet bsg. B1 through B3 were bored within <br /> 10 to 20 feet of PP-1 and PP-2. <br /> 6116103 Environmental Health staff review and concurrence with no further action <br /> required conclusion of consultant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.