My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_1999 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 10:21:50 AM
Creation date
4/28/2020 11:32:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2003
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response: In response to your request, enclosed you will find the facility's 2003 Letter <br /> of Financial Responsibility. A copy of this letter has been sent to the facility and the <br /> operator of the facility has been instructed to keep this document available for review on <br /> site. <br /> 3. Alleged Violation: The UST Program Inspection Report stated, "HSC—25284.2— <br /> Annual spill bucket testing. Provide the results of these tests by 12/31/03." In the <br /> corresponding Violation checklist, a check was placed next to "Violation(s) not listed <br /> above." <br /> Response: At the time of the inspection,this facility was current and up to date on its <br /> annual spill bucket testing requirements pursuant to Health& Safety Code section <br /> 25284.2. The facility will arrange to have the 2003 spill bucket testing performed prior <br /> to December 31, 2003. The results of the 2003 spill bucket testing will be forwarded to <br /> your office as soon as they are available. <br /> Comment in Report: The UST Program Inspection Report stated, "Submit the results of <br /> the monitoring certification and mechanical leak detector tests to our office within 30 <br /> days." <br /> Response: Tait environmental was on site the day of the inspection to certify the <br /> monitoring system. Enclosed with this letter, please find a copy of the results for the <br /> monitoring system certification and the mechanical line leak detector tests. <br /> I have also enclosed the signed Certification of Return to Compliance form for this <br /> inspection. With the transmittal of this letter, it is our understanding that the above- <br /> mentioned alleged violations associated with this routine inspection conducted on <br /> September 5, 2003 have been resolved. If this is not correct,please contact me as soon as <br /> possible. If you have any questions regarding the enclosed documents, or if further <br /> action is required by BP/ARCO,please contact me at(800) 525-5857 x6233. <br /> Trul yours, <br /> �4— SQQ <br /> Jo chetter <br /> Erfronmental Compliance Specialist <br /> BP West Coast Retail Business Unit <br /> Enclosures <br /> cc: File 6020 <br /> Deborah Felt <br /> bcc: Sandra Ikuta <br /> Max Sloves <br />
The URL can be used to link to this page
Your browser does not support the video tag.