Laserfiche WebLink
Date of Tesli,►g/Scrvicing: 'd <br /> Site Addicss: z <br /> I,'. In-Tank Gauging /SIR Equipment: ❑ Check(his hox if lank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> 'l'ltis scc:tion must be completed if in-tank gauging ccluipiucnt is used to perform letik detection monitoring. <br /> COM We the followin checklist: — - <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes Cl No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested'? _ <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In tl►e Section 11,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD)• ❑ Check this box if LLDs are not installed. <br /> (:om tele the 0 ing checklist: <br /> [ !Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> [I N/A (Check all that apply) Simulated leak rate: Z?3 g.p.h.�; ❑0.1 g.p.li.2; C]0.2 g.p.h.2 <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 1'es ❑ No* Was(lie testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ( ❑ N/A <br /> [l Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabler <br /> N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut oft'if any portion of the monitoring system malfunction: <br /> N/A or fails a test? <br /> El Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> * In the Section 11,below,describe how and when these deficiencies were or will be corrected. <br /> 11. Colrntrteuts: <br /> -- Page 3 of 3 03101 <br />