Laserfiche WebLink
r i <br /> 3. Piping Leak Detection Monitoring Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ® Sump leak sensors connected to Veeder Root 794380-208 <br /> continuous monitoring system <br /> Specify type: Continuous <br /> ❑ Discriminating <br /> ❑ Non-discriminating <br /> ® Mechanical line leak detectors with Red Jacket XLD <br /> programmed leak threshold of three IQSS ( '�� � SMt J7 Every pumping cycle <br /> gallons per hour <br /> ❑ Electronic line leak detectors with <br /> programmed leak threshold of: Every pumping cycle <br /> ❑0.1 gph ❑0.2 Qph ❑3 gph <br /> ❑ Line integrity testing by: <br /> ❑ Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing ❑Other: <br /> ❑Third party testing <br /> ® Not required <br /> ❑ Other(Specify): <br /> 4. Dispenser Leak Detection Monito ing Equipment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ❑ Mechanical float in dispenser Continuous <br /> containment <br /> ® Electronic leak sensor in dispenser Veeder Root 794380-208 <br /> containment: <br /> ❑ Continuous <br /> Discriminating <br /> ® <br /> Non-discriminating <br /> ❑Visual inspection ❑ Daily <br /> ❑ Other: <br /> ❑ No under-dispenser containment <br /> ❑Other(specify): <br /> 5. Positive Shutdown Capabilities <br /> ❑ System does not have positive shutdown capabilities <br /> ❑ Individual dispenser shutdown will occur whenever release is sensed in under-dispenser containment <br /> ®Automatic pump shut off will occur whenever: <br /> ® Release is sensed in turbine sump <br /> ® Release is sensed in primary piping <br /> ® Release is sensed at dispenser <br /> ® Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑ Other(specify): <br /> 6. Secondary Containment Testing <br /> ❑ <br /> Secondary containment is not tested <br /> ® In the State of California, secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation, and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003,and every 36 months thereafter. <br /> 7. Annual Equipment Certification/Testin <br /> ®Annually <br /> ❑ Other(specify): <br /> 2 <br />