Laserfiche WebLink
� y <br /> ENVIRONMENTAL HEALT DEPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Donna K.Heran,R.E.H.S. Unit Supervisors <br /> X Director <br /> 304 East Weber Avenue, Third Floor Carl Borgman,R.E.H.S. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I. <br /> c.. Manager ram M <br /> Pro Douglas W.Wilson,R.E.H.S. <br /> Laurie A.Cotulla,R.E.H.S. <br /> 4��FOR a\ g g Telephone: (209) 468-3420 Margaret Lagorio,R.E.H.S.Program Manager Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Mark Barcellos,R.E.H.S. <br /> August 23, 2002 <br /> K.E. Curtis <br /> 11338 S. Harlan Rd <br /> Lathrop CA 95330 <br /> Re: Arco #6020 <br /> 1711 E. Yosemite Ave, Manteca <br /> The permit application to expose product lines, dispenser pans, and sumps for the exploration <br /> of a leak has been approved with the following conditions: <br /> 1. A complete description of work performed must be submitted within 10 days of <br /> completing the repair. <br /> 2. If any piping is to be repaired or replaced Environmental Health must be notified so <br /> that an inspection can be arranged. Soil sampling may be necessary per Environmental <br /> Health assessment. <br /> 3. Manufacturers specification sheets including instructions for the repair must be <br /> submitted prior to beginning the repair. Per Environmental Health assessment of <br /> findings, new plans and a permit application may be required to be submitted. <br /> 4. A 30-minute line pressure test must be performed on the primary and secondary piping <br /> of all exposed lines and witnessed by Environmental Health prior to backfilling. <br /> 5. If sumps or dispenser pans are changed a 24-hour lake test will be required. <br /> 6. After completion of work, a line tightness test must be performed by a certified third <br /> party technician on all exposed piping. Results must be sent to Environmental Health <br /> within 10 days of completing the repair. <br /> 7. If concrete is broken near the underground storage tank a tank integrity test performed <br /> by a licensed tank tester after the cement is poured. Results must be received by this <br /> office within 10 days of completing the repair. <br /> 8. Notify Environmental Health of all third party test dates. <br /> 9. Notify Environmental Health once work is complete. A final inspection may be <br /> required. <br /> 10. Allow 48hour notice for all inspection appointments. <br /> To schedule an inspection appointment contact Michelle Sterni Le, REHS at (209)468-9847. <br /> Thank you, <br /> Michelle Sterni Le, REHS <br /> Registered Environmental Health Specialist <br />