Laserfiche WebLink
' 14 July 2006 otd <br /> AGE-NC Project No 95-0137 <br /> ' Page 4 of 4 <br /> TPH-g and TPH-d analysis and sampling of wel15MW-3, MW-5, MW-6 through MW-8 <br /> ' Monitoring of the site should be limited to 1,2-DCA analysis to reduce costs <br /> • Installation of additional monitoring points west(northwest-down-gradient)of the current <br /> ' well network, to define the dissolved 1,2-DCA plume <br /> ' 6.0. LIMITATIONS <br /> ' Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon <br /> analytical results provided by an independent laboratory Evaluation of the hydrogeologic conditions <br /> ' at the site for the purpose of this investigation was made from a limited number of available data <br /> points(e g ,ground water samples)and subsurface conditions may vary away from these data points <br /> No other warranty,expressed or Implied,Is made as to the professional interpretations,opinions,and <br /> ' recommendations contained in this report <br /> 1 . , <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • <br /> ' Advanced GeoEnvironmental,Inc <br /> 1 <br />