Laserfiche WebLink
' TABLE 8 <br /> CORRECTIVE ACTION OPTIONS <br /> RIPON FARM SERVICE <br /> 22871 South Highway 99, Ripon, Caltfonua <br />' Method Advantages Disadvantages Estimated Costs <br /> (incl. Monitoring and <br /> Maintenance <br /> In-situ Soil Vapor • Easily combined with Greater than 90% $40,000 to$75,000 <br /> Extraction other methods (t a IAS)• reduction of annually <br /> Readily available contaminants generally <br /> equipment• Conducive not attainable• Large <br /> site conditions • mitral equipment cost- <br /> Relattvely rapid cleanup Supplemental fuel <br />' period(18 to 24 months) required and costs can be <br /> • Can cleanup excessive as <br /> contaminated soil under contaminants decrease <br />' structures Air permitting required - <br /> Only non-saturated soils <br /> cleaned up <br />' Excavation • Theoretical removal of •Cost-effectiveness Could exceed$90,000 for <br /> 100%of contaminants• decreases with depth of excavation,treatment <br /> Relatively short contamination • Cannot and/or disposal could <br /> remediation period cleanup under structures• exceed$250,000 <br /> After removal,excavated <br /> soil must be treated or <br /> disposed• Backfill <br /> material and compaction <br /> costs can be excessive <br />' In-situ Bioremediation • Relatively simple design • Regulatory approval can $60,000 to <br /> (Soil) and operation • Short be difficult to obtain • $110,000 total cost <br /> treatment period,usually Additional inoculations <br /> 12 to 24 months • Works sometimes necessary <br />' well in most soil types Nutrient addition <br /> where no btotoxicrty is sometimes necessary <br /> present Not effective in sods with <br /> high concentrations of <br /> hydrocarbons <br />' In-situ Air Spargrng • Cleanup technique • Initial equipment/design $25,000 to$50,000, <br /> compatible with site costs can be costly• annually depending upon <br />' conditions• Combines capitol treatment period <br /> well with SVE• Readily <br /> available equipment <br />' Site conditions are <br /> conducive for [AS <br /> treatment• Little <br /> equipment maintenance <br /> required <br /> Advanced Geo£nvironmentaI,Inc <br />